To meet the demand of a variety of different clients and project needs, we offer a range of water well construction techniques that offer maximum flexibility and capability. We have experience working in many different environments and can offer you the best solution to your particular needs. See below for more information about our capacity in this field.
Drilling Rig MI20
The rig is designed for drilling up to 450 m and is used for water wells, geothermal applications, geotechnics, coring, seismic. Compactness and solidity are the main characteristics of the rig which is designed to work with several drilling methods: reverse circulation by mud and by air, down the hole hammer drilling, conventional circulation.
WORK METHODS
- Rotation with direct circulation
- Nucleus destruction with bleeding by water, mud and foam
- Rotation with down the hole hammer
- Reverse circulation
- Coring
Drilling Rig MI12
It is a very versatile drilling rig used for various applications: water wells (beyond 250 m), geothermal applications, geotechnics and seismic. The rig can be either crawler or truck mounted and he can work by all the main drilling methods: mud pump, coring, augering, down the hole hammer drilling using an adequate compressor. All controls are located for ease of operation and safety with the rig positioning controls on a fixed panel and the drilling controls on a remote rotating arm or extension cable.
WORK METHODS
- Rotation with direct circulation
- Nucleus destruction with bleeding by water, mud and foam
- Rotation with down the hole hammer
- Rotation with down the hole hammer
- Coring
Service and rehabilitation rig for water wells
Service rig used for rehabilitation of water wells, cleaning, fishing, pump testing and bore hole washing.
OUR Mission
G6 trading mission is to significantly increase the quality of work and expertise in the water sector in Ethiopia through professional engineering services and innovative products. We continually strive to improve the quality and suitability of our services through developing new ideas while improving our capacity.
Contact Details
In front of Bole Overpass Bridge,TK Int’l Bldg,
2nd floor, Off. No. 2-206/205
Addis Ababa, Ethiopia